MATERIAL/EVENTS INFORMATION
Intimation Of Receipt Of Letters Of Award/Intent For 9 MW Solar Power Plant Under Captive Power Producer ('CPP') Segment
Signing of Power Purchase Agreement (‘PPA’) for 620MWAC (917MWDC) for grid connected Solar and Hybrid RE projects
Intimation of Change in Status of Sun Drops Energia Private Limited from Wholly Owned Subsidiary to Subsidiary of KPI Green Energy Limited (“Company”)
Intimation of receiving CEIG (Charging) approval for 5 MW Solar Power Project under Captive Power Producer (‘CPP’) segment October 3, 2024
Announcement under Regulation 30 (LODR)-Amendments to Memorandum & Articles of Association
Intimation of receiving Letter of Award for development of 66.20 MW Hybrid Power Project under Captive Power Producer (‘CPP’) segment September 25, 2024
Intimation Of Receiving CEIG Approval For 12.72 MW Wind-Solar Hybrid Power Project Under CPP Segment September 06, 2024
Intimation of receiving CEIG (Charging) approval for 16 MW Solar Power Project under Captive Power Producer (‘CPP’) segment September 4, 2024
Intimation of receipt of Letters of Intent for 7 MW Solar Power Plant under Captive Power Producer (‘CPP’) Segment September 03, 2024
Intimation for achieving Zero Net Debt Status on Standalone Basis
Intimation of receipt of Letters of Intent for 13.30 MW Solar Power Plant under Captive Power Producer (‘CPP’) Segment August 26, 2024
Intimation of receipt of Letters of Intent (‘LOIs’) from GUVNL for 620MWAC (917MWDC) for grid connected Solar and Hybrid RE projects, July 25, 2024
Intimation of Investment in Limited Liability Partnership (LLP)
Intimation of receipt of Letter of Award (‘LOA’) for 100MWAC Solar Power Project from Maharashtra State Power Generation Co. Ltd. (MAHAGENCO)
Intimation of receiving new order of 100 MW Hybrid Captive Power Project
Intimation of Signing of Power Purchase Agreement (‘PPA’) for 50MW (comprising of 50MW Solar and 16.80 MW Wind) Solar-Wind Hybrid Power Project July 5, 2024
Intimation of receiving CEIG (Charging) approval for 15 MW Solar Power Project under Captive Power Producer (‘CPP’) segment July 1, 2024
Intimation of receiving CEIG (Charging) approval for 13.60 MW Solar Power Projects under IPP Segment July 1, 2024
Intimation of alteration of Capital Clause of Memorandum of Association ('MOA') July 1, 2024
Intimation of Sanctioning of Financial Assistance for 200 MWAC (240 MWDC) Solar Photovoltaic Power Project at Khavda, Gujarat
Announcement Under Regulation 30 (LODR) - Updates Regarding Stake In The Wholly Owned Subsidiary Company
Intimation Of Receiving New Orders Of 26.15 MW Solar Power Plant Under CPP Segment
Intimation of receiving new orders of 74.30 MW Solar Power Plant under CPP Segment including 20 MW Solar Power Project being part of wind-solar hybrid power project from captive customer April 30, 2024
Intimation Regarding Grant Of Stock Options Under KPI Green Energy Limited Employee Stock Option Plan 2023 April 02, 2024
Signing of Power Purchase Agreement (‘PPA’) for 620MWAC (917MWDC) for grid connected Solar and Hybrid RE projects
Intimation of Change in Status of Sun Drops Energia Private Limited from Wholly Owned Subsidiary to Subsidiary of KPI Green Energy Limited (“Company”)
Intimation of receiving CEIG (Charging) approval for 5 MW Solar Power Project under Captive Power Producer (‘CPP’) segment October 3, 2024
Announcement under Regulation 30 (LODR)-Amendments to Memorandum & Articles of Association
Intimation of receiving Letter of Award for development of 66.20 MW Hybrid Power Project under Captive Power Producer (‘CPP’) segment September 25, 2024
Intimation Of Receiving CEIG Approval For 12.72 MW Wind-Solar Hybrid Power Project Under CPP Segment September 06, 2024
Intimation of receiving CEIG (Charging) approval for 16 MW Solar Power Project under Captive Power Producer (‘CPP’) segment September 4, 2024
Intimation of receipt of Letters of Intent for 7 MW Solar Power Plant under Captive Power Producer (‘CPP’) Segment September 03, 2024
Intimation for achieving Zero Net Debt Status on Standalone Basis
Intimation of receipt of Letters of Intent for 13.30 MW Solar Power Plant under Captive Power Producer (‘CPP’) Segment August 26, 2024
Intimation of receipt of Letters of Intent (‘LOIs’) from GUVNL for 620MWAC (917MWDC) for grid connected Solar and Hybrid RE projects, July 25, 2024
Intimation of Investment in Limited Liability Partnership (LLP)
Intimation of receipt of Letter of Award (‘LOA’) for 100MWAC Solar Power Project from Maharashtra State Power Generation Co. Ltd. (MAHAGENCO)
Intimation of receiving new order of 100 MW Hybrid Captive Power Project
Intimation of Signing of Power Purchase Agreement (‘PPA’) for 50MW (comprising of 50MW Solar and 16.80 MW Wind) Solar-Wind Hybrid Power Project July 5, 2024
Intimation of receiving CEIG (Charging) approval for 15 MW Solar Power Project under Captive Power Producer (‘CPP’) segment July 1, 2024
Intimation of receiving CEIG (Charging) approval for 13.60 MW Solar Power Projects under IPP Segment July 1, 2024
Intimation of alteration of Capital Clause of Memorandum of Association ('MOA') July 1, 2024
Intimation of Sanctioning of Financial Assistance for 200 MWAC (240 MWDC) Solar Photovoltaic Power Project at Khavda, Gujarat
Announcement Under Regulation 30 (LODR) - Updates Regarding Stake In The Wholly Owned Subsidiary Company
Intimation Of Receiving New Orders Of 26.15 MW Solar Power Plant Under CPP Segment
Intimation of receiving new orders of 74.30 MW Solar Power Plant under CPP Segment including 20 MW Solar Power Project being part of wind-solar hybrid power project from captive customer April 30, 2024
Intimation Regarding Grant Of Stock Options Under KPI Green Energy Limited Employee Stock Option Plan 2023 April 02, 2024
Intimation Of Receiving CEIG Approval For 10 MW Solar Power Projects Under IPP Segment March 30, 2024
Intimation of receiving CEIG (Charging) approvals for 54.74 MW Solar Power Projects March 29, 2024
Intimation of receiving new order of 2.6 MWp Solar Power Plant under CPP Segment March 29, 2024
Bagging of 100MWAC Solar Power Project under tender issued by Maharashtra State Power Generation Co. Ltd. (MAHAGENCO) March 16, 2024
Bagging of 50MW (comprising of 16.80 MW Wind and 50MW Solar) Wind-Solar Hybrid Power Project under tender issued by Gujarat Urja Vikas Nigam Limited (GUVNL) March 14, 2024
Intimation of receiving an order for development of 305MWac solar power projects being part of wind-solar hybrid power project from Aditya Birla Renewables Subsidiary Limited and ABREL (RJ) Projects Limited March 08, 2024
Intimation of receiving new orders of 9.40 MW Solar Power Plant under Captive Power Producer Segment March 06, 2024
Intimation of Signing of Power Purchase Agreement (‘PPA’) for 200MWAC (240MWp) grid connected Solar Photovoltaic Power Project March 02, 2024
Intimation in connection with sale of fractional shares that arose out of bonus issue February 26, 2024
Adoption of tariff for 200MWAC (240MWp) grid connected Solar Photovoltaic Power Project February 23, 2024
Announcement under Regulation 30 (LODR)-Allotment of Bonus shares.
Intimation of receiving new order of 1.5 MW Solar Power Plant under CPP Segment February 15, 2024
Intimation of Alteration in Memorandum of Association (MoA) February 07, 2024
Intimation of receiving new order of 15 MW Solar Power Plant under Captive Power Producer Segment February 3,2024
Intimation of receiving new order of 5 MW Solar Power Plant under Captive Power Producer Segment January 30, 2024
Intimation of receiving new order of 5.60 MW Solar Power Plant under Captive Power Producer Segment January 19, 2024
Intimation of receiving new order of 2 MW Solar Power Plant under Captive Power Producer Segment January 11, 2024
Intimation of receiving new order of 3 MW Solar Power Plant under Captive Power Producer Segment January 5, 2024
Intimation of receiving new orders of 2.10 MW Solar Power Plant under Captive Power Producer Segment January 3, 2024
Announcement Under Regulation 30 (LODR) – Resignation of Director, December 30, 2023
Intimation of commissioning of 17.35 MWp Solar Power Projects under Captive Power segment December 27, 2023
Intimation of commissioning of 16.83 MW Solar Power Plant under Captive Power Producer Segment December 26, 2023
Intimation of receiving new orders of 1.80 MW Solar Power Plant under Captive Power Producer Segment December 22, 2023
Intimation of placing an order of 193.2 MW comprising 92 Wind Turbines of S120 - 140 model by KP Group to Suzlon Energy Limited_December 21, 2023
Intimation of receiving new orders of 1.75 MW Solar Power Plant under CPP Segment_December 8, 2023
Intimation of receiving new order of 4.40 MW Solar Power Plant under CPP Segment December 2, 2023
Intimation of receiving new order of 4.66 MW Solar Power Plant under CPP Segment_24 November, 2023
Intimation of receiving new order of 1.60 MW Solar Power Plant under CPP Segment_10 November, 2023
Intimation of receiving Letter of Award for development of 22.26 MWp Solar Power Project under Captive Power Producer CPP segment 7 November, 2023
Intimation of receiving repeat orders aggregating to 2.70 MW Solar Power Plant under CPP Segment 7 November, 2023
Intimation of receiving new orders aggregating to 5.70 MW Solar Power Plant under CPP Segment November 3, 2023
Intimation of signing of MoU with Government of Uttarakhand to set up 500 MW Solar Power Projects under CPP Segment
Intimation of receiving new order of 2.10 MW capacity under Wind-Solar Hybrid Power Project comprising of 2.10 MW wind and 1 MW Solar under CPP Segment
Intimation of receiving new order of 4.20 MW capacity under Wind-Solar Hybrid Power Project comprising of 4.20 MW wind and 3.60 MW Solar under (‘CPP’) Segment_October 23, 2023
Intimation of receiving new orders aggregating to 4.20 MW Solar Power Plant under CPP Segment_October 8, 2023
Intimation of receiving new orders aggregating to 12.10 MW Solar Power Plant under CPP Segment_October 5, 2023
Intimation of receiving new orders aggregating to 7 MW Solar Power Plant under CPP Segment_October 3, 2023
Intimation of receiving new order for 6.90 MW capacity under Wind-Solar Hybrid Power Project comprising of 4.90 MW wind and 2 MW Solar under CPP Segment_October 3, 2023
Intimation of receiving CEIG (Charging) approval for 7 MW Solar Power Project under CPP Segment_September 30, 2023
Intimation of Alteration in Memorandum of Association (MoA) September 29, 2023
Intimation of receiving Letter of Intent for development of 145.20 MW (comprising of 145.20 MW Wind and 50 MW Solar) Wind-Solar Hybrid Power Project
Intimation of commissioning of 7.80MW Wind-Solar Hybrid Power Project comprising of 4.20MW wind and 3.60 MW solar capacity under CPP segment
Intimation of receiving new order aggregating to 9 MW Solar Power Plant under Captive Power Producer ('CPP') Segment
Intimation of receiving new orders aggregating to 9.70 MW Solar Power Plant under CPP Segment_August 29, 2023
Intimation of receiving Commissioning Certificate of 4.10MW Wind-Solar Hybrid Power Project comprising of 2.10MW wind and 2MWdc solar capacity under IPP segment
Intimation of Execution of strategic partnership understanding with Government of Maharashtra undertaking
Bagging of 200MWAC (240MWP) grid connected Solar Photovoltaic Power Project
Intimation of placing an order of 47.60 MW comprising 17 Wind Turbines of S133 model by KP Group to Suzlon Energy Limited_ July 11, 2023
Intimation of receiving Commissioning Certificate of 9.40MW Wind-Solar Hybrid Power Project comprising of 5.40MW wind and 4MWdc solar capacity under CPP segment_July 5,2023
Intimation of receiving Commissioning Certificate from GEDA for capacity of 6.40 MWdc Solar Power Plant under CPP_june 15, 2023
Intimation of receiving Commissioning Certificate from GEDA for 7.20MW Wind-Solar Hybrid Power Project comprising of 4.20MW wind and 3MWdc solar capacity under CPP segment_ June 09, 2023
Intimation of receiving Commissioning Certificate of 26.10MW Wind-Solar Hybrid Power Project comprising of 16.10MW wind and 10MWdc solar capacity under IPP segment_June 08, 2023
Intimation of receiving largest single LOI for 40 MW comprising of 21.50 MW Wind and 18.50 MW Solar Wind-Solar Hybrid Power Project under CPP segment_June 07, 2023
Intimation of receiving CEIG (Charging) approval for 9.40MW Wind-Solar Hybrid Power Project comprising of 5.40MW wind and 4MWdc solar capacity under CPP segment_May 17, 2023
Intimation of receiving Commissioning Certificate from GEDA for capacity of 10.18 MWdc Solar Power Plant under CPP_May 16, 2023
Intimation of commissioning of 7.20MW Wind-Solar Hybrid Power Project comprising of 4.20MW wind and 3MWdc solar capacity under CPP segment_May 11, 2023
Intimation of receiving a new order of 35 MW Solar Power Plant under CPP Segment
Intimation of commissioning of 26.10MW Wind-Solar Hybrid Power Project comprising of 16.10MW wind and 10MWdc solar capacity under IPP segment April 25, 2023
Execution of Joint Business Development Agreement with Tristar Transport LLC, UAE April 13, 2023
Intimation of receiving CEIG (Charging) approval for 61.97 MW (Solar and Wind-Solar Hybrid) capacity April 11, 2023
Intimation of receiving CEIG (Charging) approvals for 54.74 MW Solar Power Projects March 29, 2024
Intimation of receiving new order of 2.6 MWp Solar Power Plant under CPP Segment March 29, 2024
Bagging of 100MWAC Solar Power Project under tender issued by Maharashtra State Power Generation Co. Ltd. (MAHAGENCO) March 16, 2024
Bagging of 50MW (comprising of 16.80 MW Wind and 50MW Solar) Wind-Solar Hybrid Power Project under tender issued by Gujarat Urja Vikas Nigam Limited (GUVNL) March 14, 2024
Intimation of receiving an order for development of 305MWac solar power projects being part of wind-solar hybrid power project from Aditya Birla Renewables Subsidiary Limited and ABREL (RJ) Projects Limited March 08, 2024
Intimation of receiving new orders of 9.40 MW Solar Power Plant under Captive Power Producer Segment March 06, 2024
Intimation of Signing of Power Purchase Agreement (‘PPA’) for 200MWAC (240MWp) grid connected Solar Photovoltaic Power Project March 02, 2024
Intimation in connection with sale of fractional shares that arose out of bonus issue February 26, 2024
Adoption of tariff for 200MWAC (240MWp) grid connected Solar Photovoltaic Power Project February 23, 2024
Announcement under Regulation 30 (LODR)-Allotment of Bonus shares.
Intimation of receiving new order of 1.5 MW Solar Power Plant under CPP Segment February 15, 2024
Intimation of Alteration in Memorandum of Association (MoA) February 07, 2024
Intimation of receiving new order of 15 MW Solar Power Plant under Captive Power Producer Segment February 3,2024
Intimation of receiving new order of 5 MW Solar Power Plant under Captive Power Producer Segment January 30, 2024
Intimation of receiving new order of 5.60 MW Solar Power Plant under Captive Power Producer Segment January 19, 2024
Intimation of receiving new order of 2 MW Solar Power Plant under Captive Power Producer Segment January 11, 2024
Intimation of receiving new order of 3 MW Solar Power Plant under Captive Power Producer Segment January 5, 2024
Intimation of receiving new orders of 2.10 MW Solar Power Plant under Captive Power Producer Segment January 3, 2024
Announcement Under Regulation 30 (LODR) – Resignation of Director, December 30, 2023
Intimation of commissioning of 17.35 MWp Solar Power Projects under Captive Power segment December 27, 2023
Intimation of commissioning of 16.83 MW Solar Power Plant under Captive Power Producer Segment December 26, 2023
Intimation of receiving new orders of 1.80 MW Solar Power Plant under Captive Power Producer Segment December 22, 2023
Intimation of placing an order of 193.2 MW comprising 92 Wind Turbines of S120 - 140 model by KP Group to Suzlon Energy Limited_December 21, 2023
Intimation of receiving new orders of 1.75 MW Solar Power Plant under CPP Segment_December 8, 2023
Intimation of receiving new order of 4.40 MW Solar Power Plant under CPP Segment December 2, 2023
Intimation of receiving new order of 4.66 MW Solar Power Plant under CPP Segment_24 November, 2023
Intimation of receiving new order of 1.60 MW Solar Power Plant under CPP Segment_10 November, 2023
Intimation of receiving Letter of Award for development of 22.26 MWp Solar Power Project under Captive Power Producer CPP segment 7 November, 2023
Intimation of receiving repeat orders aggregating to 2.70 MW Solar Power Plant under CPP Segment 7 November, 2023
Intimation of receiving new orders aggregating to 5.70 MW Solar Power Plant under CPP Segment November 3, 2023
Intimation of signing of MoU with Government of Uttarakhand to set up 500 MW Solar Power Projects under CPP Segment
Intimation of receiving new order of 2.10 MW capacity under Wind-Solar Hybrid Power Project comprising of 2.10 MW wind and 1 MW Solar under CPP Segment
Intimation of receiving new order of 4.20 MW capacity under Wind-Solar Hybrid Power Project comprising of 4.20 MW wind and 3.60 MW Solar under (‘CPP’) Segment_October 23, 2023
Intimation of receiving new orders aggregating to 4.20 MW Solar Power Plant under CPP Segment_October 8, 2023
Intimation of receiving new orders aggregating to 12.10 MW Solar Power Plant under CPP Segment_October 5, 2023
Intimation of receiving new orders aggregating to 7 MW Solar Power Plant under CPP Segment_October 3, 2023
Intimation of receiving new order for 6.90 MW capacity under Wind-Solar Hybrid Power Project comprising of 4.90 MW wind and 2 MW Solar under CPP Segment_October 3, 2023
Intimation of receiving CEIG (Charging) approval for 7 MW Solar Power Project under CPP Segment_September 30, 2023
Intimation of Alteration in Memorandum of Association (MoA) September 29, 2023
Intimation of receiving Letter of Intent for development of 145.20 MW (comprising of 145.20 MW Wind and 50 MW Solar) Wind-Solar Hybrid Power Project
Intimation of commissioning of 7.80MW Wind-Solar Hybrid Power Project comprising of 4.20MW wind and 3.60 MW solar capacity under CPP segment
Intimation of receiving new order aggregating to 9 MW Solar Power Plant under Captive Power Producer ('CPP') Segment
Intimation of receiving new orders aggregating to 9.70 MW Solar Power Plant under CPP Segment_August 29, 2023
Intimation of receiving Commissioning Certificate of 4.10MW Wind-Solar Hybrid Power Project comprising of 2.10MW wind and 2MWdc solar capacity under IPP segment
Intimation of Execution of strategic partnership understanding with Government of Maharashtra undertaking
Bagging of 200MWAC (240MWP) grid connected Solar Photovoltaic Power Project
Intimation of placing an order of 47.60 MW comprising 17 Wind Turbines of S133 model by KP Group to Suzlon Energy Limited_ July 11, 2023
Intimation of receiving Commissioning Certificate of 9.40MW Wind-Solar Hybrid Power Project comprising of 5.40MW wind and 4MWdc solar capacity under CPP segment_July 5,2023
Intimation of receiving Commissioning Certificate from GEDA for capacity of 6.40 MWdc Solar Power Plant under CPP_june 15, 2023
Intimation of receiving Commissioning Certificate from GEDA for 7.20MW Wind-Solar Hybrid Power Project comprising of 4.20MW wind and 3MWdc solar capacity under CPP segment_ June 09, 2023
Intimation of receiving Commissioning Certificate of 26.10MW Wind-Solar Hybrid Power Project comprising of 16.10MW wind and 10MWdc solar capacity under IPP segment_June 08, 2023
Intimation of receiving largest single LOI for 40 MW comprising of 21.50 MW Wind and 18.50 MW Solar Wind-Solar Hybrid Power Project under CPP segment_June 07, 2023
Intimation of receiving CEIG (Charging) approval for 9.40MW Wind-Solar Hybrid Power Project comprising of 5.40MW wind and 4MWdc solar capacity under CPP segment_May 17, 2023
Intimation of receiving Commissioning Certificate from GEDA for capacity of 10.18 MWdc Solar Power Plant under CPP_May 16, 2023
Intimation of commissioning of 7.20MW Wind-Solar Hybrid Power Project comprising of 4.20MW wind and 3MWdc solar capacity under CPP segment_May 11, 2023
Intimation of receiving a new order of 35 MW Solar Power Plant under CPP Segment
Intimation of commissioning of 26.10MW Wind-Solar Hybrid Power Project comprising of 16.10MW wind and 10MWdc solar capacity under IPP segment April 25, 2023
Execution of Joint Business Development Agreement with Tristar Transport LLC, UAE April 13, 2023
Intimation of receiving CEIG (Charging) approval for 61.97 MW (Solar and Wind-Solar Hybrid) capacity April 11, 2023
Intimation of receiving new orders aggregating to 10 MWdc Solar Power Plant under CPP March 30,2023
Intimation of Commissioning of 10.18 MWdc Solar Power Plant under CPP March 20, 2023
Intimation of receiving Commissioning Certificate from GEDA for capacity of 31 MWdc Solar Power Plant under CPP March 15, 2023
Intimation of having signed Hybrid PPA for 1.845 MWAc capacity under IPP Segment with Ms. Garrison Engineer, Military Engineer Services, Air Force Station, Indian Armed Forces March 6, 2023
Intimation of signing of PPAs for sale of 8.35 MWdc 6.40 MWac under IPP
Intimation of Commissioning of 25 MWdc Solar Power Plant under CPP January 19, 2023
Intimation under Regulation 30 of SEBI(LODR), 2015-Appointment of CFO January 19, 2023
Announcement under Regulation 30 of SEBI(LODR), 2015- Resignation by Interim CFO January 19, 2023
Intimation of having signed PPAs for sale of 6.30 MW solar power under IPP Segment
Intimation of Alteration in Memorandum of Association (MoA) January 10, 2023
Intimation of having signed Power Purchase Agreement (PPA) for sale of 7.50 MWp Solar December 15, 2022
Intimation of receiving a new order of 33 MW Solar Power Plant under Captive Power through its wholly owned subsidiary December 15, 2022
Intimation of executing new orders aggregating to 24.90Mwp Solar Power Projects under CPP Segment through its Wholly Owned Subsidiaries December 12, 2022
Intimation regarding commissioning of 38.76 MW Solar Power Projects through wholly owned subsidiaries December 09, 2022
Fresh Intimation of receiving a New Order of 1.10 MWdc Solar Power Plant under ('CPP') Segment alonng with Additional Disclosure
Intimation of receiving a new order of 1.10 MWdc Solar Power Plant under Captive Power Producer ('CPP') Segment
Intimation of receiving Commissioning Certificate from GEDA for capacity of 5.40 MWdc Solar November 18, 2022
Intimation of receiving Commissioning Certificate from GEDA for capacity of 6 MWdc Solar Power Plant under CPP October 13, 2022.
Additional Details Required Under SEBI Circular For The Announcement Dated September 27, 2022
Intimation under Regulation 30 (LODR)- Appointment of Interim Cheif Financial Officer(CFO)
Intimation of achieving 200 MW Cumulative Consolidated Capacity, September 27, 2022
Intimation of receiving a new order of 1.40 MW under CPP, September , 27, 2022
Intimation of receiving a new order of 5.40 MW under Hybrid Project CPP, September 21, 2022
Intimation of receiving a new order of 4.20 MW under CPP September 14, 2022
Intimation of 15.88 MW WindSolar Hybrid Power Projects under IPP segment September 14, 2022
Intimation of development of 16.10 MW Hybrid Power Project under IPP Segment September 5, 2022
Dividend Updates August 13, 2022
Intimation under Regulation 30(LODR) Resignation of Chief Financial Officer(CFO)
Intimation of receiving an order of 2 MWdc Solar Power Plant under CPP, July 6, 2022
Intimation of receiving an order of 26.60 MWdc Solar Power Plant under CPP, July 5, 2022
Intimation Of Receiving Commissioning Certificate, June 13, 2022
Intimation of receiving Commissioning Certificate for 5.20 Mwdc Solar Power Plant under CPP, June 9, 2022
Intimation Of Receiving Commissioning Certificate, June 4, 2022
Intimation of Schedule of Investor Meeting, May 31, 2022
Intimation of receiving Commissioning Certificate for 1.20 Mwdc Solar Power Plant under CPP, May 23, 2022
Intimation of receiving Commissioning Certificate for 2.50 Mwdc Solar Power Plant under CPP, April 16, 2022
Intimation of Change of Name of Company
Intimation of Commissioning of 10.18 MWdc Solar Power Plant under CPP March 20, 2023
Intimation of receiving Commissioning Certificate from GEDA for capacity of 31 MWdc Solar Power Plant under CPP March 15, 2023
Intimation of having signed Hybrid PPA for 1.845 MWAc capacity under IPP Segment with Ms. Garrison Engineer, Military Engineer Services, Air Force Station, Indian Armed Forces March 6, 2023
Intimation of signing of PPAs for sale of 8.35 MWdc 6.40 MWac under IPP
Intimation of Commissioning of 25 MWdc Solar Power Plant under CPP January 19, 2023
Intimation under Regulation 30 of SEBI(LODR), 2015-Appointment of CFO January 19, 2023
Announcement under Regulation 30 of SEBI(LODR), 2015- Resignation by Interim CFO January 19, 2023
Intimation of having signed PPAs for sale of 6.30 MW solar power under IPP Segment
Intimation of Alteration in Memorandum of Association (MoA) January 10, 2023
Intimation of having signed Power Purchase Agreement (PPA) for sale of 7.50 MWp Solar December 15, 2022
Intimation of receiving a new order of 33 MW Solar Power Plant under Captive Power through its wholly owned subsidiary December 15, 2022
Intimation of executing new orders aggregating to 24.90Mwp Solar Power Projects under CPP Segment through its Wholly Owned Subsidiaries December 12, 2022
Intimation regarding commissioning of 38.76 MW Solar Power Projects through wholly owned subsidiaries December 09, 2022
Fresh Intimation of receiving a New Order of 1.10 MWdc Solar Power Plant under ('CPP') Segment alonng with Additional Disclosure
Intimation of receiving a new order of 1.10 MWdc Solar Power Plant under Captive Power Producer ('CPP') Segment
Intimation of receiving Commissioning Certificate from GEDA for capacity of 5.40 MWdc Solar November 18, 2022
Intimation of receiving Commissioning Certificate from GEDA for capacity of 6 MWdc Solar Power Plant under CPP October 13, 2022.
Additional Details Required Under SEBI Circular For The Announcement Dated September 27, 2022
Intimation under Regulation 30 (LODR)- Appointment of Interim Cheif Financial Officer(CFO)
Intimation of achieving 200 MW Cumulative Consolidated Capacity, September 27, 2022
Intimation of receiving a new order of 1.40 MW under CPP, September , 27, 2022
Intimation of receiving a new order of 5.40 MW under Hybrid Project CPP, September 21, 2022
Intimation of receiving a new order of 4.20 MW under CPP September 14, 2022
Intimation of 15.88 MW WindSolar Hybrid Power Projects under IPP segment September 14, 2022
Intimation of development of 16.10 MW Hybrid Power Project under IPP Segment September 5, 2022
Dividend Updates August 13, 2022
Intimation under Regulation 30(LODR) Resignation of Chief Financial Officer(CFO)
Intimation of receiving an order of 2 MWdc Solar Power Plant under CPP, July 6, 2022
Intimation of receiving an order of 26.60 MWdc Solar Power Plant under CPP, July 5, 2022
Intimation Of Receiving Commissioning Certificate, June 13, 2022
Intimation of receiving Commissioning Certificate for 5.20 Mwdc Solar Power Plant under CPP, June 9, 2022
Intimation Of Receiving Commissioning Certificate, June 4, 2022
Intimation of Schedule of Investor Meeting, May 31, 2022
Intimation of receiving Commissioning Certificate for 1.20 Mwdc Solar Power Plant under CPP, May 23, 2022
Intimation of receiving Commissioning Certificate for 2.50 Mwdc Solar Power Plant under CPP, April 16, 2022
Intimation of Change of Name of Company
Intimation of Schedule of Investor Meeting, March 23, 2022
Announcement under Regulation 30 (LODR)-Amendment to Memorandum and Articles of Association
Intimation of Commissioning of 3.50 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') March 10, 2022
Intimation of Commissioning of 1.50 MW (DC) Solar Power Plant under Independent Power Producer March 10, 2022
Intimation of Commissioning of 1.72 MW (DC) Solar Power Plant Under Independent Power Producer March 02, 2022
Intimation of Receiving a New Order of 25 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment February 22, 2022
Intimation of Receiving a New Order of 25 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment February 14, 2022
Intimation of Receiving a New Order of 25 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment February 08, 2022
Intimation of Receiving a New Order of 2 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment January 22, 2022
Takeover of Entire Financial Assistance Availed by KPI Global from (PFC), New Delhi to State Bank Of India, Surat January 19, 2022
Intimation of Receiving an Order of 2 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment January 17, 2022
Intimation Of Having Signed PPA For Sale Of 3.10 MW (AC), 4.12 MW (DC) Solar Power Under IPP January 15, 2022
Intimation of Re-Allocation of the Existing Capacity of 1.25 MW Solar Power Under Independent Power Producer ('IPP') January 15, 2022
Intimation of Commissioning of 2.964 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') January 11, 2022
Intimation of Receiving an Order of 2 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment January 07, 2022
Intimation of Receiving an Order Of 10 MWDC Solar Power Plant Under Captive Power Producer ('CPP') Segment January 03, 2022
Intimation of Receiving an Order of 10 MWDC Solar Power Plant Under Captive Power Producer ('CPP') Segment December 29, 2022
Intimation of Receiving an Order of 2.50 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment December 20, 2021
Intimation of Receiving an Order of 2.78 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment December 16, 2021
Intimation of Commissioning of 5.084 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') December 14, 2021
Intimation of Receiving an Order of 2.70 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment December 07, 2021
Intimation of Receiving an Order of 1.10 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment December 06, 2021
Intimation of receiving an order of 5.20 MWdc Solar Power Plant under CPP, November 22, 2021
Intimation of receiving order of 1.80 MWdc Solar Power Plant under CPP, November 17, 2021
Intimation of receiving an order of 2.60 MW dc Solar Power Plant under CPP, November 15, 2021
Intimation of receiving an order of 10 MW Solar Power Plant under CPP, October 8, 2021
Intimation of having signed PPA for sale of 1.25 MW Solar Power under IPP, October 7, 2021
Announcement under Regulation 30 (LODR)- Resignation of Director, October 5, 2021
Intimation of receiving an order of INR 39 Crores from M/s. Anupam Rasayan India Limited on signing of Operation & Maintenance Agreement & Land Lease Agreement for 25 years for 12.50 MW Solar Power Plant under CPP, October 1, 2021
Intimation of Terminating PPA signed for the capacity of 1.25 MW Solar Power Plant under IPP, October 1, 2021
Intimation of Commissioning of 600 KW (AC) 693 KW (DC) Solar Power Plant under CPP, September 28, 2021
Intimation of Terminating PPA signed for the capacity of 1.10 MW Solar Power Plant under IPP, September 8, 2021
Intimation of Commissionig of 5.44 MW Solar Power Plant under IPP, August 23, 2021
IIntimation of Commissionig of 2.05 MW Solar Power Plant under IPP, August 20, 2021
Intimation of terminating PPA signed for the capacity of 1.20 MW solar power plant under IPP August 17, 2021
Intimation under Regulation 30(LODR) - Appointment of Additional Independent Director and CFO
Intimation of Commissioning of 7.76 MW (DC) Solar Power Plant Under IPP
Intimation of migration of equity shares from BSE SME to BSE Main Board & NSE, July 24, 2021
Intimation for In-principle received from NSE for Migration, July 17, 2021
Intimation of having signed PPA for sale of 5.70 MW Solar Power under IPP, June 15, 2021
Intimation under Regulation 30 (LODR)-Resignation of Chief Financial Officer (CFO)
Intimation of renewing or signing of PPA of 1.75 MW Solar Power Plant under IPP, June 2, 2021
Intimation of receiving order of 3.50 MW Solar Power Plant under CPP, May 26, 2021
Intimation for in-principle approval received from BSE for Migration, May 13, 2021
Announcement under Regulation 30 (LODR)-Resignation of Director, May 4, 2021
Intimation of receiving order of 12.50 MW Solar Power Plant Under CPP, May 3, 2021
Announcement under Regulation 30 (LODR)-Amendment to Memorandum and Articles of Association
Intimation of Commissioning of 3.50 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') March 10, 2022
Intimation of Commissioning of 1.50 MW (DC) Solar Power Plant under Independent Power Producer March 10, 2022
Intimation of Commissioning of 1.72 MW (DC) Solar Power Plant Under Independent Power Producer March 02, 2022
Intimation of Receiving a New Order of 25 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment February 22, 2022
Intimation of Receiving a New Order of 25 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment February 14, 2022
Intimation of Receiving a New Order of 25 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment February 08, 2022
Intimation of Receiving a New Order of 2 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment January 22, 2022
Takeover of Entire Financial Assistance Availed by KPI Global from (PFC), New Delhi to State Bank Of India, Surat January 19, 2022
Intimation of Receiving an Order of 2 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment January 17, 2022
Intimation Of Having Signed PPA For Sale Of 3.10 MW (AC), 4.12 MW (DC) Solar Power Under IPP January 15, 2022
Intimation of Re-Allocation of the Existing Capacity of 1.25 MW Solar Power Under Independent Power Producer ('IPP') January 15, 2022
Intimation of Commissioning of 2.964 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') January 11, 2022
Intimation of Receiving an Order of 2 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment January 07, 2022
Intimation of Receiving an Order Of 10 MWDC Solar Power Plant Under Captive Power Producer ('CPP') Segment January 03, 2022
Intimation of Receiving an Order of 10 MWDC Solar Power Plant Under Captive Power Producer ('CPP') Segment December 29, 2022
Intimation of Receiving an Order of 2.50 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment December 20, 2021
Intimation of Receiving an Order of 2.78 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment December 16, 2021
Intimation of Commissioning of 5.084 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') December 14, 2021
Intimation of Receiving an Order of 2.70 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment December 07, 2021
Intimation of Receiving an Order of 1.10 Mwdc Solar Power Plant Under Captive Power Producer ('CPP') Segment December 06, 2021
Intimation of receiving an order of 5.20 MWdc Solar Power Plant under CPP, November 22, 2021
Intimation of receiving order of 1.80 MWdc Solar Power Plant under CPP, November 17, 2021
Intimation of receiving an order of 2.60 MW dc Solar Power Plant under CPP, November 15, 2021
Intimation of receiving an order of 10 MW Solar Power Plant under CPP, October 8, 2021
Intimation of having signed PPA for sale of 1.25 MW Solar Power under IPP, October 7, 2021
Announcement under Regulation 30 (LODR)- Resignation of Director, October 5, 2021
Intimation of receiving an order of INR 39 Crores from M/s. Anupam Rasayan India Limited on signing of Operation & Maintenance Agreement & Land Lease Agreement for 25 years for 12.50 MW Solar Power Plant under CPP, October 1, 2021
Intimation of Terminating PPA signed for the capacity of 1.25 MW Solar Power Plant under IPP, October 1, 2021
Intimation of Commissioning of 600 KW (AC) 693 KW (DC) Solar Power Plant under CPP, September 28, 2021
Intimation of Terminating PPA signed for the capacity of 1.10 MW Solar Power Plant under IPP, September 8, 2021
Intimation of Commissionig of 5.44 MW Solar Power Plant under IPP, August 23, 2021
IIntimation of Commissionig of 2.05 MW Solar Power Plant under IPP, August 20, 2021
Intimation of terminating PPA signed for the capacity of 1.20 MW solar power plant under IPP August 17, 2021
Intimation under Regulation 30(LODR) - Appointment of Additional Independent Director and CFO
Intimation of Commissioning of 7.76 MW (DC) Solar Power Plant Under IPP
Intimation of migration of equity shares from BSE SME to BSE Main Board & NSE, July 24, 2021
Intimation for In-principle received from NSE for Migration, July 17, 2021
Intimation of having signed PPA for sale of 5.70 MW Solar Power under IPP, June 15, 2021
Intimation under Regulation 30 (LODR)-Resignation of Chief Financial Officer (CFO)
Intimation of renewing or signing of PPA of 1.75 MW Solar Power Plant under IPP, June 2, 2021
Intimation of receiving order of 3.50 MW Solar Power Plant under CPP, May 26, 2021
Intimation for in-principle approval received from BSE for Migration, May 13, 2021
Announcement under Regulation 30 (LODR)-Resignation of Director, May 4, 2021
Intimation of receiving order of 12.50 MW Solar Power Plant Under CPP, May 3, 2021
Intimation of extension in order of Solar Power Plant under CPP, April 5, 2021
Intimation of Re-allocation of the existing capacity of 1.25 MW Solar Power under IPP, April 5, 2021
Intimation of Commissioning of 900 KW Solar Power Plant under CPP, March 11, 2021
Intimation of Bagged an order of 900 KW Solar Power Plant Under CPP, March 1, 2021
Intimation of having signed PPA for sale of 3 MW solar power under IPP, February 19, 2021
Intimation of Commissioning of 6.20 MW Solar Power Plant under IPP, February 19, 2021
Intimation of having signed PPA for sale of 13.15 MW solar power under IPP, February 5, 2021
Intimation of Re-allocation of the existing capacity of 3.68 MW solar power under IPP, February 5, 2021
Intimation of cancellation of 1.995 MW solar power plant under CPP and IPP Segment, February 5, 2021
Intimation of having signed PPA for sale of 2.50 MW solar power under IPP January 2, 2021
Assignment of rating for proposed Non-Convertible Debenture December 11, 2020
Intimation of having signed PPA for sale of 2.50 MW solar power under IPP December 7, 2020
Intimation of having signed PPA for sale of 1.30 MW solar power under IPP December 4, 2020
Intimation of having signed PPA for sale of 1.50 MW solar power under IPP October 21, 2020
Successfully Charging of new 11kV transmission line for the power evacuation capacity of 4MW October 19, 2020
Intimation of Commissioning of 1.125 MW Solar Power Project under CPP, October 15, 2020
Intimation of Commissioning of 1.125 MW Solar Power Project under CPP, October 15, 2020
Intimation of having signed PPA for sale of 1.25 MW solar power under IPP October 15, 2020
Intimation of Alteration in MoA and AoA of the Company October 7, 2020
Development of new 11Kv transmission line for the evacuation of 4MW capacity September 23, 2020
Intimation of having signed PPA for sale of 2 MW solar power under IPP September 5, 2020
Intimation of having signed PPA for sale of 1.10 MW solar power under IPP, August 21, 2020
Intimation of sad demise of Non-Executive Non-Independent Director of the Company, August 12, 2020
Sanctioning of Financial Assistance for 15MW (Existing) and 20MW (Proposed) Solar Power Project From PFC, August 11, 2020
Intimation of terminating 213.75 KW Solar Power Plant under CPP, August 4, 2020
Intimation of Commissioning of 615 KW Solar Power Project under CPP, July 27, 2020
Intimation of having signed PPA for sale of 1.10 MW solar power under IPP, June 26, 2020
Intimation of having signed PPA for sale of 1.10 MW solar power under IPP, June 24, 2020
Intimation of Commissioning of 2.12 MW solar power project under IPP, June 24, 2020
Disclosure of material impact of CoVID 19 pandemic under SEBI (LODR) Regulations, 2015
Intimation of Re-allocation of the existing capacity of 1.25 MW Solar Power under IPP, April 5, 2021
Intimation of Commissioning of 900 KW Solar Power Plant under CPP, March 11, 2021
Intimation of Bagged an order of 900 KW Solar Power Plant Under CPP, March 1, 2021
Intimation of having signed PPA for sale of 3 MW solar power under IPP, February 19, 2021
Intimation of Commissioning of 6.20 MW Solar Power Plant under IPP, February 19, 2021
Intimation of having signed PPA for sale of 13.15 MW solar power under IPP, February 5, 2021
Intimation of Re-allocation of the existing capacity of 3.68 MW solar power under IPP, February 5, 2021
Intimation of cancellation of 1.995 MW solar power plant under CPP and IPP Segment, February 5, 2021
Intimation of having signed PPA for sale of 2.50 MW solar power under IPP January 2, 2021
Assignment of rating for proposed Non-Convertible Debenture December 11, 2020
Intimation of having signed PPA for sale of 2.50 MW solar power under IPP December 7, 2020
Intimation of having signed PPA for sale of 1.30 MW solar power under IPP December 4, 2020
Intimation of having signed PPA for sale of 1.50 MW solar power under IPP October 21, 2020
Successfully Charging of new 11kV transmission line for the power evacuation capacity of 4MW October 19, 2020
Intimation of Commissioning of 1.125 MW Solar Power Project under CPP, October 15, 2020
Intimation of Commissioning of 1.125 MW Solar Power Project under CPP, October 15, 2020
Intimation of having signed PPA for sale of 1.25 MW solar power under IPP October 15, 2020
Intimation of Alteration in MoA and AoA of the Company October 7, 2020
Development of new 11Kv transmission line for the evacuation of 4MW capacity September 23, 2020
Intimation of having signed PPA for sale of 2 MW solar power under IPP September 5, 2020
Intimation of having signed PPA for sale of 1.10 MW solar power under IPP, August 21, 2020
Intimation of sad demise of Non-Executive Non-Independent Director of the Company, August 12, 2020
Sanctioning of Financial Assistance for 15MW (Existing) and 20MW (Proposed) Solar Power Project From PFC, August 11, 2020
Intimation of terminating 213.75 KW Solar Power Plant under CPP, August 4, 2020
Intimation of Commissioning of 615 KW Solar Power Project under CPP, July 27, 2020
Intimation of having signed PPA for sale of 1.10 MW solar power under IPP, June 26, 2020
Intimation of having signed PPA for sale of 1.10 MW solar power under IPP, June 24, 2020
Intimation of Commissioning of 2.12 MW solar power project under IPP, June 24, 2020
Disclosure of material impact of CoVID 19 pandemic under SEBI (LODR) Regulations, 2015
Intimation of receiving order of 1 MW Solar Power Plant under IPP March 12, 2020
Intimation of receiving order of 900KW Solar Power Plant under Captive Power Producer February 17, 2020
Intimation of receiving order of 810KW Solar Power Plant under Captive Power Producer CPP February 12, 2020
Intimation of receiving order of 2.250MW Solar Power Plant under Captive Power Producer CPP January 23, 2020
Intimation of commissioning of 1.20 MW Solar Power Plant under Captive Power Producer CPP January 3, 2020
Approval received from GEDA for an additional capacity of 20 MW December 27, 2019
Intimation of Commissioning of new capacity of 7.5 MW under IPP Category December 26, 2019
Intimation of Change in Registered Office Address November 13, 2019
Intimation of Commissioning of new Capacity of 7 MW Under IPP Category October 1 ,2019
Intimation of having signed New PPA of 1 MW Solar Power Plant under IPP September 4, 2019
Intimation of shifting of Devang Paper Mills Solar Project from IPP to CPP Category
Intimation of having signed New PPA of 950 KW Solar Power Plant under IPP July 25, 2019
Change in Market Maker for the Equity Shares of K.P.I. Global Infrastructure Limited July 23, 2019
Intimation of having signed New PPA of 1 MW Solar Power Plant under IPP July 10, 2019
Intimation of having signed New PPA of 1.10 MW Solar Power Plant under IPP July 6, 2019
Approval of Enhancement In Solar Power Evacuation from 30MW To 70MW July 3, 2019
Intimation of Commissioning of New Capacity of 8.827 MW Under IPP Category July 3, 2019
Intimation of having signed New PPA of 1.475 MW Solar Power Plant under IPP July 2, 2019
Intimation of Commissioning of 315KW Solar Power Plant under CPP June 17, 2019
Intimation of Resignation of Independent Director June 12, 2019
Company Update June 10, 2019
Company Update June 4, 2019
Company Update May 6, 2019
Company Update May 01, 2019
Company Update April 18, 2019
Company Update April 12, 2019
Company Update April 11, 2019
Company Update April 05, 2019
Company Update April 03, 2019
Intimation of receiving order of 900KW Solar Power Plant under Captive Power Producer February 17, 2020
Intimation of receiving order of 810KW Solar Power Plant under Captive Power Producer CPP February 12, 2020
Intimation of receiving order of 2.250MW Solar Power Plant under Captive Power Producer CPP January 23, 2020
Intimation of commissioning of 1.20 MW Solar Power Plant under Captive Power Producer CPP January 3, 2020
Approval received from GEDA for an additional capacity of 20 MW December 27, 2019
Intimation of Commissioning of new capacity of 7.5 MW under IPP Category December 26, 2019
Intimation of Change in Registered Office Address November 13, 2019
Intimation of Commissioning of new Capacity of 7 MW Under IPP Category October 1 ,2019
Intimation of having signed New PPA of 1 MW Solar Power Plant under IPP September 4, 2019
Intimation of shifting of Devang Paper Mills Solar Project from IPP to CPP Category
Intimation of having signed New PPA of 950 KW Solar Power Plant under IPP July 25, 2019
Change in Market Maker for the Equity Shares of K.P.I. Global Infrastructure Limited July 23, 2019
Intimation of having signed New PPA of 1 MW Solar Power Plant under IPP July 10, 2019
Intimation of having signed New PPA of 1.10 MW Solar Power Plant under IPP July 6, 2019
Approval of Enhancement In Solar Power Evacuation from 30MW To 70MW July 3, 2019
Intimation of Commissioning of New Capacity of 8.827 MW Under IPP Category July 3, 2019
Intimation of having signed New PPA of 1.475 MW Solar Power Plant under IPP July 2, 2019
Intimation of Commissioning of 315KW Solar Power Plant under CPP June 17, 2019
Intimation of Resignation of Independent Director June 12, 2019
Company Update June 10, 2019
Company Update June 4, 2019
Company Update May 6, 2019
Company Update May 01, 2019
Company Update April 18, 2019
Company Update April 12, 2019
Company Update April 11, 2019
Company Update April 05, 2019
Company Update April 03, 2019
INTIMATION OUTCOME OF BOARD MEETINGS
Intimation of Board Meeting November 6, 2024
Outcome of the Board Meeting August 31, 2024
Intimation of the Board Meeting August 31, 2024
Outcome of the Board Meeting August 16, 2024
Outcome of the Board Meeting August 16, 2024
Outcome of the Board Meeting August 12, 2024
Outcome of the Board Meeting August 08, 2024
Intimation of the Board Meeting August 8, 2024
Outcome of the Board Meeting May 23, 2024
Outcome of the Board Meeting May 13, 2024
Intimation of Board Meeting May 13, 2024
Intimation of Board Meeting May 23, 2024
Outcome of the Board Meeting May 3, 2024
Outcome of the Board Meeting April 25, 2024
Intimation of the Board Meeting April 25, 2024
Outcome of the Board Meeting August 31, 2024
Intimation of the Board Meeting August 31, 2024
Outcome of the Board Meeting August 16, 2024
Outcome of the Board Meeting August 16, 2024
Outcome of the Board Meeting August 12, 2024
Outcome of the Board Meeting August 08, 2024
Intimation of the Board Meeting August 8, 2024
Outcome of the Board Meeting May 23, 2024
Outcome of the Board Meeting May 13, 2024
Intimation of Board Meeting May 13, 2024
Intimation of Board Meeting May 23, 2024
Outcome of the Board Meeting May 3, 2024
Outcome of the Board Meeting April 25, 2024
Intimation of the Board Meeting April 25, 2024
Outcome of Board Meeting held on February 16, 2024.
Outcome of Board Meeting held on February 14, 2024
Intimation of the Board Meeting February 14, 2024
Outcome of the Board Meeting held on December 30, 2023
Intimation of the Board Meeting December 30, 2023
Outcome of Board Meeting December 22, 2023
Outcome of Board Meeting December 21, 2023
Intimation of Board Meeting December 21, 2023
Outcome of the meeting of the Board of Directors of KPI Green Energy Limited (‘Company’) held on December 18, 2023 for QIP Issue opening and other matters
Outcome of the meeting of the Board of Directors of KPI Green Energy Limited (‘Company’) held on December 18, 2023 for approval of Unaudited interim condensed consolidated financial statements for six-months ended September 30, 2023
Outcome of Board Meeting December 4, 2023
Outcome of Board Meeting October 11, 2023
Outcome of Board Meeting October 9, 2023
Intimation of Board Meeting October 11, 2023
Intimation of Board Meeting October 9, 2023
Outcome of the Board Meeting September 1, 2023
Intimation of the Board Meeting September 1, 2023
Outcome of the Board Meeting August 11, 2023
Intimation of the Board Meeting August 11, 2023
Outcome of the Board Meeting May 26, 2023
Intimation of the Board Meeting May 26, 2023
Outcome of Board Meeting held on February 14, 2024
Intimation of the Board Meeting February 14, 2024
Outcome of the Board Meeting held on December 30, 2023
Intimation of the Board Meeting December 30, 2023
Outcome of Board Meeting December 22, 2023
Outcome of Board Meeting December 21, 2023
Intimation of Board Meeting December 21, 2023
Outcome of the meeting of the Board of Directors of KPI Green Energy Limited (‘Company’) held on December 18, 2023 for QIP Issue opening and other matters
Outcome of the meeting of the Board of Directors of KPI Green Energy Limited (‘Company’) held on December 18, 2023 for approval of Unaudited interim condensed consolidated financial statements for six-months ended September 30, 2023
Outcome of Board Meeting December 4, 2023
Outcome of Board Meeting October 11, 2023
Outcome of Board Meeting October 9, 2023
Intimation of Board Meeting October 11, 2023
Intimation of Board Meeting October 9, 2023
Outcome of the Board Meeting September 1, 2023
Intimation of the Board Meeting September 1, 2023
Outcome of the Board Meeting August 11, 2023
Intimation of the Board Meeting August 11, 2023
Outcome of the Board Meeting May 26, 2023
Intimation of the Board Meeting May 26, 2023
Outcome of Board meeting January 31, 2023
Intimation of Board meeting January 31, 2023
Outcome of Board Meeting January 19, 2023
Outcome of Board Meeting November 30, 2022
Intimation of Board meeting November 30, 2022
Outcome of Board meeting October 18, 2022
Intimation of Board Meeting October 18, 2022
Outcome of Board meeting September 28, 2022
Outcome of Board meeting September 1, 2022
Intimation of Board Meeting September 1, 2022
Outcome of Board Meeting August 13, 2022
Revised Record date for Interim Dividend August 23, 2022
Intimation of Board Meeting August 13, 2022
Outcome of Board meeting May 7, 2022
Intimation of Board meeting May 7, 2022
Outcome of Board meeting May 3, 2022
Intimation of Board Meeting May 3, 2022
Intimation of Board meeting January 31, 2023
Outcome of Board Meeting January 19, 2023
Outcome of Board Meeting November 30, 2022
Intimation of Board meeting November 30, 2022
Outcome of Board meeting October 18, 2022
Intimation of Board Meeting October 18, 2022
Outcome of Board meeting September 28, 2022
Outcome of Board meeting September 1, 2022
Intimation of Board Meeting September 1, 2022
Outcome of Board Meeting August 13, 2022
Revised Record date for Interim Dividend August 23, 2022
Intimation of Board Meeting August 13, 2022
Outcome of Board meeting May 7, 2022
Intimation of Board meeting May 7, 2022
Outcome of Board meeting May 3, 2022
Intimation of Board Meeting May 3, 2022
Outcome of the Board Meeting held on January 17, 2022
Intimation of the Board Meeting to be held on January 17, 2022
Outcome of Board Meeting February 1, 2022
Outcome of Board Meeting November 2, 2021
Intimation of Board Meeting November 2, 2021
Outcome of Board Meeting October 6, 2021
Outcome of Board Meeting August 31, 2021
Intimation of Board Meeting August 31, 2021
Outcome of Board Meeting August 14, 2021
Intimation of Board Meeting August 14, 2021
Outcome of Board Meeting August 3, 2021
Outcome of Board Meeting June 28, 2021
Intimation of Board Meeting June 28, 2021
Outcome of Board Meeting May 29, 2021
Intimation of the Board Meeting to be held on January 17, 2022
Outcome of Board Meeting February 1, 2022
Outcome of Board Meeting November 2, 2021
Intimation of Board Meeting November 2, 2021
Outcome of Board Meeting October 6, 2021
Outcome of Board Meeting August 31, 2021
Intimation of Board Meeting August 31, 2021
Outcome of Board Meeting August 14, 2021
Intimation of Board Meeting August 14, 2021
Outcome of Board Meeting August 3, 2021
Outcome of Board Meeting June 28, 2021
Intimation of Board Meeting June 28, 2021
Outcome of Board Meeting May 29, 2021
Outcome of Board meeting February 10, 2021
Outcome of Board meeting September 30, 2020
Intimation of Board Meeting November 12, 2020
Outcome of Board Meeting September 28, 2020
Outcome of Board Meeting August 31, 2020
Intimation of Board Meeting August 31, 2020
Outcome of Board Meeting July 22, 2020
Intimation of Board Meeting July 22, 2020
Outcome of Board meeting September 30, 2020
Intimation of Board Meeting November 12, 2020
Outcome of Board Meeting September 28, 2020
Outcome of Board Meeting August 31, 2020
Intimation of Board Meeting August 31, 2020
Outcome of Board Meeting July 22, 2020
Intimation of Board Meeting July 22, 2020
INTIMATION OUTCOME OF GENERAL MEETINGS
AGM Video Recording September 25, 2024
Voting Results of Annual General Meeting September 25, 2024
Outcome of 16th Annual General Meeting September 25, 2024
Notice of Annual General Meeting 2023-24
Intimation of E-voting facilities for AGM 2023-24
Intimation of Book Closure for AGM 2023-24
EGM Video Recording November 3, 2023
Outcome of Extra Ordinary General Meeting November 3, 2023
Voting Results of Extra Ordinary General Meeting November 3, 2023
Intimation of E-voting facilitis for EOGM 2023-24
Registered Valuer's Valuation Report October 11, 2023
Notice of Extra Ordinary General Meeting 2023-24
Voting Results of Annual General Meeting September 25, 2024
Outcome of 16th Annual General Meeting September 25, 2024
Notice of Annual General Meeting 2023-24
Intimation of E-voting facilities for AGM 2023-24
Intimation of Book Closure for AGM 2023-24
EGM Video Recording November 3, 2023
Outcome of Extra Ordinary General Meeting November 3, 2023
Voting Results of Extra Ordinary General Meeting November 3, 2023
Intimation of E-voting facilitis for EOGM 2023-24
Registered Valuer's Valuation Report October 11, 2023
Notice of Extra Ordinary General Meeting 2023-24
AGM Video Recording September 30, 2021
Voting Results of Annual General Meeting September 30, 2021
Outcome of Annual General Meeting September 30, 2021
Newspaper Advertisement- Notice of 13th AGM through VC or OAVM facility September 9, 2021
Notice of Annual General Meeting – 2020-21
Intimation of Book Closure for AGM 2020-21
Intimation of E-Voting Facilities for AGM 2020-21
Voting Results of Annual General Meeting September 30, 2021
Outcome of Annual General Meeting September 30, 2021
Newspaper Advertisement- Notice of 13th AGM through VC or OAVM facility September 9, 2021
Notice of Annual General Meeting – 2020-21
Intimation of Book Closure for AGM 2020-21
Intimation of E-Voting Facilities for AGM 2020-21
Revised Disclosure of Voting results of AGM held on September 28, 2019
Intimation of Book Closure for the AGM September 28, 2019
Disclosure of Voting results of AGM held on September 28, 2019
Outcome of Annual General Meeting September 28, 2019
Newspaper clippings of Notice of 11th Annual General Meeting
Notice of Annual General Meeting - 2018-19
Intimation of Book Closure for the AGM September 28, 2019
Disclosure of Voting results of AGM held on September 28, 2019
Outcome of Annual General Meeting September 28, 2019
Newspaper clippings of Notice of 11th Annual General Meeting
Notice of Annual General Meeting - 2018-19
NEWSPAPER ADVERTISEMENTS
Newspaper Advertisement for Notice of 16th Annual General Meeting, Remote E-voting Information and Book Closure etc
Newspaper Advertisement for 16th AGM through VC or OAVM Facility September 2, 2024
Newspaper Advertisements - Notice of Postal Ballot May 23, 2024
Newspaper Advertisements - Notice of Postal Ballot May 04, 2024
Newspaper Advertisement for 16th AGM through VC or OAVM Facility September 2, 2024
Newspaper Advertisements - Notice of Postal Ballot May 23, 2024
Newspaper Advertisements - Notice of Postal Ballot May 04, 2024
Newspaper Publication of Audited Financial Results (Standalone & Consolidated) for the Quarter and Year Ended March 31, 2024
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for the Quarter Ended December 31, 2023
Newspaper Advertisement for Notice of Postal Ballot
Newspaper Advertisement for Notice of Extra Ordinary General Meeting, Remote E-voting information etc.
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for the Quarter and Half Year Ended September 30, 2023
Newspaper Advertisement for Notice of 15th Annual General Meeting, Remote E-voting Information and Book Closure etc.
Newspaper Advertisement for 15th AGM through VC or OAVM facility September 4, 2023
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for the Quarter Ended June 30, 2023
Newspaper Publication of Audited Financial Results (Standalone & Consolidated) for the Quarter and Year Ended March 31, 2023_May 27, 2023
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for the Quarter Ended December 31, 2023
Newspaper Advertisement for Notice of Postal Ballot
Newspaper Advertisement for Notice of Extra Ordinary General Meeting, Remote E-voting information etc.
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for the Quarter and Half Year Ended September 30, 2023
Newspaper Advertisement for Notice of 15th Annual General Meeting, Remote E-voting Information and Book Closure etc.
Newspaper Advertisement for 15th AGM through VC or OAVM facility September 4, 2023
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for the Quarter Ended June 30, 2023
Newspaper Publication of Audited Financial Results (Standalone & Consolidated) for the Quarter and Year Ended March 31, 2023_May 27, 2023
Newspaper Advertisement- Notice of Postal Ballot December 5, 2022
Newspaper publication of Unaudited Financial Results (Standalone & Consolidated) for the quarter and half year ended September 30, 2022.
Newspaper Advertisement – Notice of 14th AGM, Remote E-voting information and Book Closure etc.
Newspaper Advertisement for 14th AGM through VC or OAVM facility September 3, 2022
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for the Quarter ended June 30, 2022
Newspaper Publication of Audited Financial Results (Standalone & Consolidated) for the Quarter and Year Ended March 31, 2022 May 5, 2022
Newspaper publication of Unaudited Financial Results (Standalone & Consolidated) for the quarter and half year ended September 30, 2022.
Newspaper Advertisement – Notice of 14th AGM, Remote E-voting information and Book Closure etc.
Newspaper Advertisement for 14th AGM through VC or OAVM facility September 3, 2022
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for the Quarter ended June 30, 2022
Newspaper Publication of Audited Financial Results (Standalone & Consolidated) for the Quarter and Year Ended March 31, 2022 May 5, 2022
Newspaper Advertisements -Notice of Postal February 7, 2022
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for January 19, 2022
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for November 3, 2021
Newspaper Advertisement - Notice of 13th Annual General Meeting through Video Conferencing September 9, 2021
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for August 17, 2021
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for January 19, 2022
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for November 3, 2021
Newspaper Advertisement - Notice of 13th Annual General Meeting through Video Conferencing September 9, 2021
Newspaper Publication of Unaudited Financial Results (Standalone & Consolidated) for August 17, 2021
Newspaper Advertisement - Postal Ballot Notice and Remote E-voting facility February 15, 2021
Newspaper Advertisement - Postal Ballot Notice and Remote E-voting facility October 14, 2020
Newspaper Advertisement - 12th Annual General Meeting, Remote E-Voting Information and Book Closure etc. September 10, 2020
Newspaper Advertisement - 12th Annual General Meeting through Video Conferencing September 5, 2020
Newspaper Advertisement - Postal Ballot Notice and Remote E-voting facility October 14, 2020
Newspaper Advertisement - 12th Annual General Meeting, Remote E-Voting Information and Book Closure etc. September 10, 2020
Newspaper Advertisement - 12th Annual General Meeting through Video Conferencing September 5, 2020
POSTAL BALLOT
Voting Result of the Postal Ballot March 19, 2021
Newspaper Advertisement Postal Ballot Notice and Remote E-voting February 15, 2021
Notice of Postal Ballot February 10, 2021
Intimation of calendar of events for the Postal Ballot process February 11, 2021
Voting Results of the Postal Ballot November 13, 2020
Newspaper Advertisement Postal Ballot Notice and Remote E-voting October 14, 2020
Notice of Postal Ballot September 28, 2020
Intimation of calendar of events for the postal ballot process
Newspaper Advertisement Postal Ballot Notice and Remote E-voting February 15, 2021
Notice of Postal Ballot February 10, 2021
Intimation of calendar of events for the Postal Ballot process February 11, 2021
Voting Results of the Postal Ballot November 13, 2020
Newspaper Advertisement Postal Ballot Notice and Remote E-voting October 14, 2020
Notice of Postal Ballot September 28, 2020
Intimation of calendar of events for the postal ballot process
STATEMENT OF INVESTOR COMPLAINTS
DISCLOSURE OF RELATED PARTY TRANSACTION
ANNUAL SECRETARIAL COMPLIANCE REPORT
CREDIT RATING
STATEMENT OF UNCLAIMED AND UNPAID DIVIDEND
Statement of Unpaid & Unclaimed Dividend of 4th Interim Dividend for the FY22-23
Statement of Unpaid & Unclaimed Dividend of 3rd Interim Dividend for the FY22-23
Statement of Unpaid & Unclaimed Dividend of 2nd Interim Dividend for the FY22-23
Statement of Unpaid & Unclaimed Dividend of 1st Interim Dividend for the FY22-23
Statement of Unpaid & Unclaimed Dividend of 3rd Interim Dividend for the FY22-23
Statement of Unpaid & Unclaimed Dividend of 2nd Interim Dividend for the FY22-23
Statement of Unpaid & Unclaimed Dividend of 1st Interim Dividend for the FY22-23
OTHER STOCK EXCHANGE SUBMISSIONS
Submission of Certificate under Regulation 74(5) of the Securities and Exchange Board of India (Depository and Participants) Regulations, 2018 for the quarter ended September 30, 2024
Disclosures under Reg. 31(2) of SEBI (SAST) Regulations, 2011, October 1, 2024
Disclosures under Reg. 31(1) of SEBI (SAST) Regulations, 2011, October 1, 2024
Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011, October 1, 2024
Disclosures under Reg. 29(1) of SEBI (SAST) Regulations, 2011, October 1, 2024
Intimation of Closure of Trading Window September 30, 2024
Submission of Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended June 30, 2024
Intimation of Record date for Sub-Division/Split of Equity Shares of the Company July 2, 2024
Intimation of Closure of Trading Window June 30, 2024
Announcement under Regulation 30 (LODR)-Monitoring Agency Report
Disclosures under Reg. 31(2) of SEBI (SAST) Regulations, 2011, October 1, 2024
Disclosures under Reg. 31(1) of SEBI (SAST) Regulations, 2011, October 1, 2024
Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011, October 1, 2024
Disclosures under Reg. 29(1) of SEBI (SAST) Regulations, 2011, October 1, 2024
Intimation of Closure of Trading Window September 30, 2024
Submission of Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended June 30, 2024
Intimation of Record date for Sub-Division/Split of Equity Shares of the Company July 2, 2024
Intimation of Closure of Trading Window June 30, 2024
Announcement under Regulation 30 (LODR)-Monitoring Agency Report
Certificate under Regulation 40(9) of SEBI (LODR) Regulations, 2015 for the financial year ended March 31, 2024
Compliance Certificate under Regulation 7(3) of SEBI (LODR) Regulations, 2015 for the FY 2023-24
Submission of Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended March 31, 2024
Intimation of Closure of Trading Window March 31, 2024
Announcement under Regulation 30 (LODR)-Monitoring Agency Report
Intimation of record date for issue of Bonus Equity Shares January 16, 2024
Certificate under Regulation 74(5) of the Securities and Exchange Board of India (Depository and Participants) Regulations, 2018 for the quarter ended December 31, 2023
Intimation of Closure of Trading Window December 31, 2023
Update on acquisition of remaining stake of KPark Sunbeat Private Limited ('KPark') by KPI Green Energy Limited (Company)
Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended September 30, 2023
Closure of Trading Window September 30, 2023
Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended June 30, 2023
Closure of Trading Window June 30, 2023
Press Release Great Place to Work Certification Announcement June 2 2023
Compliance Certificate under Regulation 7(3) of SEBI (LODR) Regulations, 2015 for the FY 2023-24
Submission of Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended March 31, 2024
Intimation of Closure of Trading Window March 31, 2024
Announcement under Regulation 30 (LODR)-Monitoring Agency Report
Intimation of record date for issue of Bonus Equity Shares January 16, 2024
Certificate under Regulation 74(5) of the Securities and Exchange Board of India (Depository and Participants) Regulations, 2018 for the quarter ended December 31, 2023
Intimation of Closure of Trading Window December 31, 2023
Update on acquisition of remaining stake of KPark Sunbeat Private Limited ('KPark') by KPI Green Energy Limited (Company)
Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended September 30, 2023
Closure of Trading Window September 30, 2023
Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended June 30, 2023
Closure of Trading Window June 30, 2023
Press Release Great Place to Work Certification Announcement June 2 2023
Initial Disclosure under SEBI Circular on fund raising by issuance of Debt Securities by Large Entities
Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended March 31, 2023
Certificate under Regulation 40(9) of SEBI (LODR) Regulations, 2015 for the financial year ended March 31, 2023
Compliance Certificate under Regulation 7(3) of SEBI (LODR) Regulations, 2015 for the FY 2022-23
Closure of Trading Window March 31, 2023
Closure of Trading Window December 31, 2022
Clarification on Record Date for issue of Bonus Equity Shares December 20, 2022
Disclosures under Reg. 31(2) of SEBI (SAST) Regulations, 2011 December 12, 2022
Intimation of Record Date for issue of Bonus Equity Shares December 12, 2022
Communication Email to shareholders_Third Interim Dividend 2022-23
Closure of Trading Window September 30, 2022
Communication Email to shareholders_Second Interim Dividend 2022-23
Closure of Trading Window June 30, 2022
Newspaper Publication of Audited Financial Results for the Quarter and Year Ended March 31, 2022
Communication Email to shareholders_First Interim Dividend FY22-23
Revised Code of Conduct May 3, 2022
Certificate under Regulation 74(5) of the Securities and Exchange Board of India (DP) Regulations, 2018 for the quarter ended March 31, 2023
Certificate under Regulation 40(9) of SEBI (LODR) Regulations, 2015 for the financial year ended March 31, 2023
Compliance Certificate under Regulation 7(3) of SEBI (LODR) Regulations, 2015 for the FY 2022-23
Closure of Trading Window March 31, 2023
Closure of Trading Window December 31, 2022
Clarification on Record Date for issue of Bonus Equity Shares December 20, 2022
Disclosures under Reg. 31(2) of SEBI (SAST) Regulations, 2011 December 12, 2022
Intimation of Record Date for issue of Bonus Equity Shares December 12, 2022
Communication Email to shareholders_Third Interim Dividend 2022-23
Closure of Trading Window September 30, 2022
Communication Email to shareholders_Second Interim Dividend 2022-23
Closure of Trading Window June 30, 2022
Newspaper Publication of Audited Financial Results for the Quarter and Year Ended March 31, 2022
Communication Email to shareholders_First Interim Dividend FY22-23
Revised Code of Conduct May 3, 2022
Confirmation under SEBI Circular on fund raising by issuance of Debt Securities by Large Entities
Certificate under Regulation 40(9) of SEBI (LODR) Regulations, 2015 for the financial year ended March 31, 2022
Communication to Shareholders January 19, 2022
Newspaper Publication of Unaudited Financial Results for the Quarter and Nine Month Ended December 31, 2021
Compliance Certificate under Regulation 7(3) of SEBI (LODR) Regulations, 2015 for the FY 2021-22
Disclosure attached under Reg. 31 (1)
Disclosure attached under Reg. 31 (2)
Closure of Trading Window, March 31, 2022
Closure of Trading Window, December 31, 2021
Newspaper Publication of Unaudited Finacial Results for the Quarter and Half Year ended September 30, 2021
Communication Email to shareholders_Interim Dividend
Closure of Trading Window, September 30, 2021
Newspaper Publication of Financial Result for the Quarter ended June 30, 2021
Revised disclosure under Reg. 29(2) of SEBI (SAST) Regulations 2011, July 20, 2021
Closure of Trading Window, June 30, 2021
Disclosure under Reg. 29(2) of SEBI (SAST) Regulations, 2011, July 8, 2021
Certificate under Regulation 40(9) of SEBI (LODR) Regulations, 2015 for the financial year ended March 31, 2022
Communication to Shareholders January 19, 2022
Newspaper Publication of Unaudited Financial Results for the Quarter and Nine Month Ended December 31, 2021
Compliance Certificate under Regulation 7(3) of SEBI (LODR) Regulations, 2015 for the FY 2021-22
Disclosure attached under Reg. 31 (1)
Disclosure attached under Reg. 31 (2)
Closure of Trading Window, March 31, 2022
Closure of Trading Window, December 31, 2021
Newspaper Publication of Unaudited Finacial Results for the Quarter and Half Year ended September 30, 2021
Communication Email to shareholders_Interim Dividend
Closure of Trading Window, September 30, 2021
Newspaper Publication of Financial Result for the Quarter ended June 30, 2021
Revised disclosure under Reg. 29(2) of SEBI (SAST) Regulations 2011, July 20, 2021
Closure of Trading Window, June 30, 2021
Disclosure under Reg. 29(2) of SEBI (SAST) Regulations, 2011, July 8, 2021
Submission of Certificate under Regulation 40(9) of SEBI (LODR) Regulations, 2015 for the half year ended March 31, 2021
Confirmation under SEBI Circular on fund raising by issuance of Debt Securities by Large Entities
Closure of Trading Window March 31, 2021
Closure of Trading Window September 30, 2020
Disclosure under SEBI (PIT) Regulation, August 25, 2020
Confirmation under SEBI Circular on fund raising by issuance of Debt Securities by Large Entities
Closure of Trading Window March 31, 2021
Closure of Trading Window September 30, 2020
Disclosure under SEBI (PIT) Regulation, August 25, 2020
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, March 31, 2020
Closure of Trading Window March 27, 2020
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, December 31, 2019
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, September 30, 2019
Disclosures of reasons for encumbrance of shares by Promoters of the Company under SEBI (SAST) Regulations, 2011
Closure of Trading Window September 30, 2019
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, June 30, 2019
Statement of Utilization of Issue proceeds of IPO as on March 31, 2019
NA Certificate under Regulation 23(9) of the SEBI (LODR) Regulations, 2015
Closure of Trading Window April 3, 2019
Closure of Trading Window March 27, 2020
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, December 31, 2019
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, September 30, 2019
Disclosures of reasons for encumbrance of shares by Promoters of the Company under SEBI (SAST) Regulations, 2011
Closure of Trading Window September 30, 2019
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, June 30, 2019
Statement of Utilization of Issue proceeds of IPO as on March 31, 2019
NA Certificate under Regulation 23(9) of the SEBI (LODR) Regulations, 2015
Closure of Trading Window April 3, 2019
Format of Initial Disclosure to be made by an entity identified as a Large Corporate, March 31, 2019
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, March 31, 2019
Disclosures under Reg. 31(1) and 31(2) of SEBI (SAST) Regulations, 2011, March 12, 2019
Disclosures under Reg. 31(1) and 31(2) of SEBI (SAST) Regulations, 2011, March 6, 2019
Certificate under 74(5) of the SEBI (Depository & Participants) Reg., 2018, March 31, 2019
Disclosures under Reg. 31(1) and 31(2) of SEBI (SAST) Regulations, 2011, March 12, 2019
Disclosures under Reg. 31(1) and 31(2) of SEBI (SAST) Regulations, 2011, March 6, 2019